Confirmation of Misaligned Fuel Lid Jig
-
Industry:
- Automotive
-
Products:
- Machine Vision

This enables the prevention of coating defects. The position of the lid is change dafter sealer coating post-electrodeposition. Because programming is performed at the lid position after the lid has been changed for the middle coating and top coating, detection is required as the jig position remaining unchanged leads to coating defects.