Check for packing before the second electrolyte Injection

The seal needs to be removed before the second electrolyte injection. Multiple inspection conditions can be satisfied simultaneously. The equipped position correction function enables stable inspection even if cells are misaligned.

Image-Based Laser Sensor

IX series

Back to "Product Selection by Industry and Application"